{"data":{"id":"us-nyc/n.y.c.-admin.-code-691.10","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § 691.10","heading":"Section 691.10","body":"Section 691.10 – Revise Section 691.10 to read as follows:\n\n691.10 Arc-Fault Mitigation. PV systems that do not comply with the requirements of 690.11, shall be noted in the documentation required in 691.6, and special permission is required.","path":["New York City Administrative Code","Title 28","Chapter 11: The New York City Electrical Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"174b614a5650955a8d340a8d7c7dfab189a746933ab71b966c2e5dc40cc708db","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-691.7","next":"us-nyc/n.y.c.-admin.-code-695.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
