{"data":{"id":"us-nyc/n.y.c.-admin.-code-ebc-908","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § EBC 908","heading":"Section EBC 908: Electrical","body":"908.1 General.\n\nAll electrical equipment and wiring within work areas shall comply with all applicable requirements of the New York City Electrical Code, this section and Sections 308 and 808 of this code.\n\n908.1.1 Compliance of the entire electrical system as new construction.\n\nWhere the building is undergoing a Level 2 alteration and the work area exceeds 75 percent of the building area, the entire electrical system shall comply with the provisions of the New York City Electrical Code for new construction.","path":["New York City Administrative Code","Title 28","Chapter 12: The New York City Existing Building Code (effective July 17, 2027)"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"1e507c8370dc7ec332767b0818cbe44cad56ff35ba876fa0f14ab0ec808412dd","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-ebc-907","next":"us-nyc/n.y.c.-admin.-code-ebc-909"},"notice":"GroundRules: Original legal text. Not legal advice."}
