{"data":{"id":"us-nyc/n.y.c.-admin.-code-ebc-910","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § EBC 910","heading":"Section EBC 910: Plumbing","body":"910.1 General.\n\nPlumbing elements and systems within work areas in buildings undergoing a Level 2 alteration shall comply with Section 310, Section 810 and this section.\n\n910.1.1 Compliance of the entire plumbing system as new construction.\n\nWhere the building is undergoing a Level 2 alteration and the work area exceeds 75 percent of the building area, the entire plumbing system shall comply with the provisions of the New York City Plumbing Code for new construction.\n\nException. Plumbing system components that are found to be in code-compliant condition upon inspection and certification by a licensed master plumber shall be permitted to remain.","path":["New York City Administrative Code","Title 28","Chapter 12: The New York City Existing Building Code (effective July 17, 2027)"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"ca771a8edd3fa2a79e6acbd286750bc87bcea3a908c279f7eb94a0621915aee5","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-ebc-909","next":"us-nyc/n.y.c.-admin.-code-ebc-911"},"notice":"GroundRules: Original legal text. Not legal advice."}
