{"data":{"id":"us-nyc/n.y.c.-admin.-code-fgc-622","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § FGC 622","heading":"Section FGC 622: Vented Room Heaters","body":"622.1 General.\n\nVented room heaters shall be tested in accordance with ANSI Z21.86/CSA 2.32, installed in accordance with the manufacturer's instructions, and shall be designed and equipped as specified in Section 602.2 of this code.","path":["New York City Administrative Code","Title 28","Chapter 9: New York City Fuel Gas Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"b1ac3f684142af19f24687becc933067c3164a27f7f9ddf5d463e2bcc3b36e0e","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-fgc-621","next":"us-nyc/n.y.c.-admin.-code-fgc-623"},"notice":"GroundRules: Original legal text. Not legal advice."}
