{"data":{"id":"us-nyc/n.y.c.-admin.-code-pc-1111","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § PC 1111","heading":"Section PC 1111: Subsoil Drains","body":"1111.1 Subsoil drains.\n\nSubsoil drains carrying groundwater shall be open-jointed, horizontally split or perforated pipe conforming to one of the standards listed in \n\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\tTable 1102.5\n\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t. Such drains shall not be less than 4 inches (102 mm) in diameter. Where the building is subject to backwater, the subsoil drain shall be protected by an accessibly located backwater valve. Subsoil drainage discharged into a public sewer shall be approved by the Department of Environmental Protection. The subsoil drains shall discharge into a readily accessible silt and sand interceptor before being connected into the gravity drainage or sump system. Subsoil drainage shall discharge to a trapped area drain, sump, dry well or approved location above ground. The subsoil sump shall not be required to have either a gas-tight cover or a vent. The sump and pumping system shall comply with Section 1113.1.","path":["New York City Administrative Code","Title 28","Chapter 6: New York City Plumbing Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"3569b0707b61326fc136fb905810ea2e7ab1f6b4a9bf57147dc624791c207657","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-pc-1110","next":"us-nyc/n.y.c.-admin.-code-pc-1112"},"notice":"GroundRules: Original legal text. Not legal advice."}
