{"data":{"id":"us-nyc/n.y.c.-admin.-code-pc-920","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § PC 920","heading":"Section PC 920: Computerized Vent Design","body":"920.1 Design of vent system.\n\nThe sizing, design and layout of the vent system shall be permitted to be determined by computer program design methods which shall be approved by the commissioner to insure compliance with the minimum standards of this code.\n\n920.2 System capacity.\n\nThe vent system shall be based on the air capacity requirements of the drainage system under a peak load condition.\n\n920.3 Design shall be certified by a Licensed Professional Engineer.\n\nAn engineer shall also inspect and certify the system upon completion of the system.","path":["New York City Administrative Code","Title 28","Chapter 6: New York City Plumbing Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"c5fd20e9c232990fcd70d958ad286f80413c5180bd96a55f74e73a3f7c4b0a1b","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-pc-919","next":"us-nyc/n.y.c.-admin.-code-pc-1001"},"notice":"GroundRules: Original legal text. Not legal advice."}
