{"data":{"id":"us-nyc/n.y.c.-admin.-code-pc-e101","jurisdiction":"us-nyc","citation":"N.Y.C. Admin. Code § PC E101","heading":"Section PC E101: General","body":"E101.1 Scope.\n\nE101.1.1\n\nThis appendix outlines the procedure that may be utilized for sizing a water piping system (see Section E103.3). The design procedure is based on the minimum static pressure available from the supply source, the head changes in the system caused by friction and elevation, and the rates of flow necessary for operation of various fixtures.","path":["New York City Administrative Code","Title 28","Chapter 6: New York City Plumbing Code"],"source_url":"https://files.amlegal.com/pdffiles/NewYorkCity/Admin/XML.zip","current_through":"Local Law 2026/135 (enacted August 31, 2026)","vintage":"","retrieved_at":"2026-09-06T02:48:57Z","sha256":"7b2c25e9737a33f88d67c860c52386fa38e9dfe2f97f751beeeca9f905a3387e","source_id":"us-nyc","stale":false,"prev":"us-nyc/n.y.c.-admin.-code-pc-c101","next":"us-nyc/n.y.c.-admin.-code-pc-e102"},"notice":"GroundRules: Original legal text. Not legal advice."}
