{"data":{"id":"us-oh/ohio-rev.-code-4935.10","jurisdiction":"us-oh","citation":"Ohio Rev. Code § 4935.10","heading":"Study to review the condition of reactive power.","body":"The public utilities commission shall conduct a study to review the condition of reactive power in the state. The commission shall issue a report of its findings to the general assembly not later than one year after the effective date of this section.","path":["Title 49 Public Utilities","Chapter 4935 Energy Data"],"source_url":"https://codes.ohio.gov/ohio-revised-code/section-4935.10","current_through":"2010-06-17 (Senate Bill 232 - 128th General Assembly)","vintage":"","retrieved_at":"2026-09-14T19:24:39Z","sha256":"a6dd961a3845fff9c3823a14925e3e6aecd83fc68875d95c7d1f898bc47f98eb","source_id":"us-oh","stale":false,"prev":"us-oh/ohio-rev.-code-4935.04","next":"us-oh/ohio-rev.-code-4937.01"},"notice":"GroundRules: Original legal text. Not legal advice."}
