{"data":{"id":"us-oh/ohio-rev.-code-5525.22","jurisdiction":"us-oh","citation":"Ohio Rev. Code § 5525.22","heading":"Demolition contracts.","body":"For contracts for projects that involve the demolition of property for a right-of-way, the director of transportation shall include in the contract adequate provision for liquidated damages and a requirement that the contractor inform the department of the method for disposal of demolition debris prior to the start of work.","path":["Title 55 Roads-Highways-Bridges","Chapter 5525 Construction Contracts"],"source_url":"https://codes.ohio.gov/ohio-revised-code/section-5525.22","current_through":"1995-06-30 (House Bill 107 - 121st General Assembly)","vintage":"","retrieved_at":"2026-09-14T19:24:40Z","sha256":"929a813005bf4217f03db908a77c3f75959d2fa8ef5a7e472faafe203c091694","source_id":"us-oh","stale":false,"prev":"us-oh/ohio-rev.-code-5525.21","next":"us-oh/ohio-rev.-code-5525.23"},"notice":"GroundRules: Original legal text. Not legal advice."}
