{"data":{"id":"us-oh/ohio-rev.-code-5555.61","jurisdiction":"us-oh","citation":"Ohio Rev. Code § 5555.61","heading":"Contract for improvement not to exceed ten per cent above estimates.","body":"After the board of county commissioners decides to proceed with the improvement, it shall do so in accordance with sections 307.86 to 307.92 of the Revised Code. No contract for any improvement shall be awarded at a price more than twenty per cent in excess of the estimated cost.","path":["Title 55 Roads-Highways-Bridges","Chapter 5555 County Road Improvement"],"source_url":"https://codes.ohio.gov/ohio-revised-code/section-5555.61","current_through":"2023-10-03 (House Bill 33 - 135th General Assembly)","vintage":"","retrieved_at":"2026-09-14T19:24:41Z","sha256":"d08886954ac708269c98d84b4876c273acd61b55633256dde8ab16a2fcfcc2e9","source_id":"us-oh","stale":false,"prev":"us-oh/ohio-rev.-code-5555.51","next":"us-oh/ohio-rev.-code-5555.66"},"notice":"GroundRules: Original legal text. Not legal advice."}