{"data":{"id":"us-oh/ohio-rev.-code-5591.24","jurisdiction":"us-oh","citation":"Ohio Rev. Code § 5591.24","heading":"Construction of approaches to county bridges.","body":"The board of county commissioners shall construct, without unnecessary delay, good and sufficient approaches or ways to bridges erected by it. The board shall contract for such construction in the same manner as for contracting for the construction of such bridges.","path":["Title 55 Roads-Highways-Bridges","Chapter 5591 County Bridges"],"source_url":"https://codes.ohio.gov/ohio-revised-code/section-5591.24","current_through":"1953-10-01 (House Bill 1 - 100th General Assembly)","vintage":"","retrieved_at":"2026-09-14T19:24:41Z","sha256":"e6dbf0615bba9100e45d738072068f8bf41a140c53261e5d57203335e9cc349e","source_id":"us-oh","stale":false,"prev":"us-oh/ohio-rev.-code-5591.23","next":"us-oh/ohio-rev.-code-5591.25"},"notice":"GroundRules: Original legal text. Not legal advice."}
