{"data":{"id":"us-oh/ohio-rev.-code-911.03","jurisdiction":"us-oh","citation":"Ohio Rev. Code § 911.03","heading":"Approval of building plans and equipment - permit.","body":"No new bakery shall be established unless the building plans and equipment proposed to be used have been approved by a certified building inspector, the department of agriculture, or by the board of health of the city or general health district. The inspector, department, or board shall refuse a permit to such bakery if the building and equipment do not comply with sections 911.01 to 911.20 of the Revised Code and the rules adopted thereunder. A hearing shall be afforded in accordance with Chapter 119. of the Revised Code.","path":["Title 9 Agriculture-Animals-Fences","Chapter 911 Bakeries"],"source_url":"https://codes.ohio.gov/ohio-revised-code/section-911.03","current_through":"1994-06-20 (Senate Bill 134 - 120th General Assembly)","vintage":"","retrieved_at":"2026-09-14T19:24:28Z","sha256":"201e82aadbbecc020e9527b1d1cdf8142af266c29ecd679c3aae055f6d1514dc","source_id":"us-oh","stale":false,"prev":"us-oh/ohio-rev.-code-911.021","next":"us-oh/ohio-rev.-code-911.04"},"notice":"GroundRules: Original legal text. Not legal advice."}
