{"data":{"id":"us-oh/ohio-rev.-code-940.26","jurisdiction":"us-oh","citation":"Ohio Rev. Code § 940.26","heading":"Cost estimate.","body":"After preparing a schedule of damages, the board of supervisors of a soil and water conservation district or its designee shall make an estimate of the cost of the proposed improvement. The estimate shall include all of the following:\n(A) Actual construction costs, including costs of addressing the construction specifications set forth in section 940.24 of the Revised Code;\n(B) The estimated costs included in the schedule of damages prepared under section 940.25 of the Revised Code;\n(C) Any expenses incurred in investigations, consulting services, and notifications related to the proposed improvement, and any other incidental costs.","path":["Title 9 Agriculture-Animals-Fences","Chapter 940 Soil And Water Conservation Commission"],"source_url":"https://codes.ohio.gov/ohio-revised-code/section-940.26","current_through":"2021-03-24 (House Bill 340 - 133rd General Assembly)","vintage":"","retrieved_at":"2026-09-14T19:24:28Z","sha256":"d854dc1ad94e91d5caf89580d9de1dad01fd6c8a9565a7c2171d3894e268771d","source_id":"us-oh","stale":false,"prev":"us-oh/ohio-rev.-code-940.25","next":"us-oh/ohio-rev.-code-940.27"},"notice":"GroundRules: Original legal text. Not legal advice."}
