{"data":{"id":"us-ok/okla.-stat.-tit.-40-40-175","jurisdiction":"us-ok","citation":"Okla. Stat. tit. 40, § 40-175","heading":"Temporary floorings in steel frame buildings","body":"If in the erection of an iron or steel framed building, the\n\nspaces between the girders or floor beams of any floor are not\n\nfilled or covered by the permanent construction of said floors\n\nbefore another story is added to the building, a close plank\n\nflooring shall be placed and maintained over such spaces, during the\n\nconstruction of each story, from the time when the beams or girders\n\nare placed in position; but openings protected by a strong hand\n\nrailing not less than four (4) feet high may be left through said\n\nfloors for the passage of workmen and material.","path":["OK Code","Title 40"],"source_url":"https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os40.pdf","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:36Z","sha256":"e2f724fcb6cd6df8cc48ccccbdc7d1d7526cc460fda6f42b233126fc4d0ffdc3","source_id":"us-ok","stale":false,"prev":"us-ok/okla.-stat.-tit.-40-40-174","next":"us-ok/okla.-stat.-tit.-40-40-176"},"notice":"GroundRules: Original legal text. Not legal advice."}
