{"data":{"id":"us-or/ors-195.220","jurisdiction":"us-or","citation":"ORS 195.220","heading":"Annexation plan provisions.","body":"(1) An annexation plan adopted under ORS 195.205 shall include:\n      (a) The timing and sequence of annexation.\n      (b) Local standards of urban service availability required as a precondition of annexation.\n      (c) The planned schedule for providing urban services to the annexed territory.\n      (d) The effects on existing urban services providers.\n      (e) The long-term benefits of the annexation plan.\n      (2) An annexation plan shall be consistent with all applicable comprehensive plans.","path":["05 - State Government, Government Procedures, Land Use","19. Miscellaneous Matters Related to Government and Public Affairs","Chapter 195 — Local Government Planning Coordination"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors195.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:12Z","sha256":"df40506ca2a2d3221ca65e02d8da7e1d0802c50152317e61f433727e400d9e33","source_id":"us-or","stale":false,"prev":"us-or/ors-195.215","next":"us-or/ors-195.225"},"notice":"GroundRules: Original legal text. Not legal advice."}
