{"data":{"id":"us-or/ors-279c.670","jurisdiction":"us-or","citation":"ORS 279C.670","heading":"Application of ORS 279C.650 to 279C.670.","body":"ORS 279C.650 to 279C.670 do not apply to suspension of the work or termination of the contract that occurs as a result of the contractor’s violation of federal, state or local statutes, ordinances, rules or regulations in existence at the time the contract was executed or as a result of violations of the terms of the contract. [2003 c.794 §164]\nPREVAILING WAGE RATE","path":["07 - Public Facilities and Finance","26. Public Facilities, Contracting and insurance","Chapter 279C — Public Contracting - Public Improvements and Related Contracts"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors279C.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:13Z","sha256":"e3b9531f7afdfbd51f4c5ccee8842a146e276282ef0c5bbeaf780ef9dcda51b0","source_id":"us-or","stale":false,"prev":"us-or/ors-279c.665","next":"us-or/ors-279c.800"},"notice":"GroundRules: Original legal text. Not legal advice."}
