{"data":{"id":"us-or/ors-446.252","jurisdiction":"us-or","citation":"ORS 446.252","heading":"Installation permit required.","body":"A person may not install a manufactured dwelling or an accessory building or structure without first obtaining from the Department of Consumer and Business Services or a municipality as provided under ORS 446.250 all permits necessary for installing the manufactured dwelling or the accessory building or structure on a lot.","path":["12 - Public Health","36. Public Health and Safety","Chapter 446 — Manufactured Dwellings and Structures; Parks; Tourist Facilities; Ownership Records; Dealers and Dealerships"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors446.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:14Z","sha256":"d2c16774ea7914737d27c123d5ae3883f989aad62d4d4b6c1d2b4d3f670eae58","source_id":"us-or","stale":false,"prev":"us-or/ors-446.250","next":"us-or/ors-446.253"},"notice":"GroundRules: Original legal text. Not legal advice."}
