{"data":{"id":"us-or/ors-537.360","jurisdiction":"us-or","citation":"ORS 537.360","heading":"Relationship between application for in-stream water right and application for certain hydroelectric permits.","body":"If an application is pending under this chapter for a water right permit to use water for hydroelectric purposes or under ORS 543.010 to 543.610 for a hydroelectric permit or license at the time the Water Resources Commission receives an application for an in-stream water right under ORS 537.336 for the same stream or reach of the stream, the commission shall not take any action on the application for an in-stream water right until the commission issues a final order approving or denying the pending hydroelectric application. [1987 c.859 §15]\n(Deschutes River Water Bank Pilot Program)","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 537 — Appropriation of Water Generally"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors537.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"5597d5b15a27c4136eddd4707901d31a19687edcb0ee5bf9198313fa176f34f5","source_id":"us-or","stale":false,"prev":"us-or/ors-537.358","next":"us-or/ors-537.385"},"notice":"GroundRules: Original legal text. Not legal advice."}
