{"data":{"id":"us-or/ors-539.170","jurisdiction":"us-or","citation":"ORS 539.170","heading":"Division of water pending hearing.","body":"While the hearing of the order of the Water Resources Director is pending in the circuit court, and until a certified copy of the judgment, order or decree of the court is transmitted to the director, the division of water from the stream involved in the appeal shall be made in accordance with the order of the director.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 539 — Before February 24, 1909; Determination of Water Rights of Federally Re"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors539.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"65c179ece1a98087927192e26e2532867d9d6285de2f7d7601fc17a45bcabeb5","source_id":"us-or","stale":false,"prev":"us-or/ors-539.160","next":"us-or/ors-539.180"},"notice":"GroundRules: Original legal text. Not legal advice."}
