{"data":{"id":"us-or/ors-543.092","jurisdiction":"us-or","citation":"ORS 543.092","heading":"Amendment of hydroelectric water right or claim; rules; unilateral amendment of power claim or uncertificated claim to assess project specific fees.","body":"(1) Upon the request of the holder and the approval of the Water Resources Department, a hydroelectric water right or claim may be amended.\n      (2) The Water Resources Department shall develop rules governing the process by which a hydroelectric water right or claim may be amended. Any amendments under subsection (1) of this section shall:\n      (a) Be consistent with the final unified state position for the project;\n      (b) Be consistent with the requirements of ORS chapter 543A;\n      (c) Cause no injury to other water rights; and\n      (d) Allow for public participation in the amendment process.\n      (3) The Water Resources Director may unilaterally amend a power claim or uncertificated claim in order to assess project specific fees under ORS 543.080.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 543 — Hydroelectric Projects"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors543.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"23df250d84d2a8d6931ec20852810bc97ca4c0517420b8f9580c8d88d3f7adbb","source_id":"us-or","stale":false,"prev":"us-or/ors-543.090","next":"us-or/ors-543.095"},"notice":"GroundRules: Original legal text. Not legal advice."}
