{"data":{"id":"us-or/ors-543.257","jurisdiction":"us-or","citation":"ORS 543.257","heading":"[1985 c.569 §11; 1985 c.673 §194; repealed by 2007 c.354 §1]","body":"[1985 c.569 §11; 1985 c.673 §194; repealed by 2007 c.354 §1]","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 543 — Hydroelectric Projects"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors543.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"dfffcf739f80211a63b1e4e60b457a4595fedd610f926114e7bd44da0b5088bb","source_id":"us-or","stale":false,"prev":"us-or/ors-543.255","next":"us-or/ors-543.260"},"notice":"GroundRules: Original legal text. Not legal advice."}
