{"data":{"id":"us-or/ors-543.680","jurisdiction":"us-or","citation":"ORS 543.680","heading":"Compliance with water appropriation laws required.","body":"A district shall comply with all applicable provisions of ORS chapter 537 before enlarging or modifying the district’s water system for the purpose of generating hydroelectric energy.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 543 — Hydroelectric Projects"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors543.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"dcf5a5528e5a2ace98bb329bfab91ee02a5981a159e03f1c393f4f95c9351a22","source_id":"us-or","stale":false,"prev":"us-or/ors-543.675","next":"us-or/ors-543.685"},"notice":"GroundRules: Original legal text. Not legal advice."}
