{"data":{"id":"us-or/ors-543.710","jurisdiction":"us-or","citation":"ORS 543.710","heading":"Annual fee based on horsepower; exemptions; disbursement.","body":"Every claimant other than a licensee under ORS 543.010 to 543.610 shall on or before January 1 of each year pay to the state in advance an annual fee based upon the theoretical water horsepower claimed under each separate claim to water and calculated using the formula under ORS 543.078 for a project of similar theoretical horsepower.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 543 — Hydroelectric Projects"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors543.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"92836feb8ca78fd7170de07f76e356f9d8225312eef45866d9df74f6c4eb55ff","source_id":"us-or","stale":false,"prev":"us-or/ors-543.705","next":"us-or/ors-543.720"},"notice":"GroundRules: Original legal text. Not legal advice."}
