{"data":{"id":"us-or/ors-543.725","jurisdiction":"us-or","citation":"ORS 543.725","heading":"[1985 c.674 §9; repealed by 1991 c.869 §15]","body":"[1985 c.674 §9; repealed by 1991 c.869 §15]","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 543 — Hydroelectric Projects"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors543.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"35c465a0c1c97a63f25c26e8219f23dd4bf56908ffa5cde323f508d5bb4c2c30","source_id":"us-or","stale":false,"prev":"us-or/ors-543.720","next":"us-or/ors-543.730"},"notice":"GroundRules: Original legal text. Not legal advice."}
