{"data":{"id":"us-or/ors-548.945","jurisdiction":"us-or","citation":"ORS 548.945","heading":"Written assent of Secretary of Interior required before judgment if district has federal contract.","body":"If a contract authorized by law has been made between the district and the United States for the construction, operation or maintenance of necessary works or for a water supply, a judgment may not be entered by the court until written assent to the judgment by the Secretary of the Interior has been filed with the court.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 548 — Provisions Applicable Both to Drainage Districts and to Irrigation"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors548.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"46f570fe66ca73c7e2ad80a513fde3f4a0e7b0494117585fc0ea79fcae55f36b","source_id":"us-or","stale":false,"prev":"us-or/ors-548.940","next":"us-or/ors-548.950"},"notice":"GroundRules: Original legal text. Not legal advice."}
