{"data":{"id":"us-or/ors-552.408","jurisdiction":"us-or","citation":"ORS 552.408","heading":"District projects; engineering plans.","body":"Construction of district works may be undertaken on motion of the district board or when landowners of the district request the district board to do so. Upon initiation of a construction project, the district board shall obtain engineering plans for the project.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 552 — Water Improvement Districts"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors552.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"c922a8092c9305b041c73fd4d41c7a9b13bef043a1517dddb90ddafa5d273697","source_id":"us-or","stale":false,"prev":"us-or/ors-552.405","next":"us-or/ors-552.410"},"notice":"GroundRules: Original legal text. Not legal advice."}
