{"data":{"id":"us-or/ors-555.110","jurisdiction":"us-or","citation":"ORS 555.110","heading":"State’s liability.","body":"Nothing in ORS 555.010 to 555.160 shall be construed as authorizing the Water Resources Commission to obligate the state to pay for any work constructed under any contract, or to hold the state in any way responsible to settlers for the failure of contractors to complete the work according to the terms of their contracts with the state.","path":["15 - Water Resources, Agriculture and Food","45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation","Chapter 555 — Reclamation Projects; Sand Control"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors555.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:15Z","sha256":"4ef72371053400705362a85c7f4a6d432b9b257be7717b4b11e586421bb0ec59","source_id":"us-or","stale":false,"prev":"us-or/ors-555.100","next":"us-or/ors-555.120"},"notice":"GroundRules: Original legal text. Not legal advice."}
