{"data":{"id":"us-or/ors-757.661","jurisdiction":"us-or","citation":"ORS 757.661","heading":"Commission authority to require filing.","body":"The Public Utility Commission may require an electric company to make any filings under this chapter that the commission determines necessary to implement ORS 757.600 to 757.667.","path":["19 - Utilities, Vehicle Code, Watercraft, Aviation","57. Utility Regulation","Chapter 757 — Utility Regulation Generally"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors757.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:17Z","sha256":"d4cbab958c727638a6d49b595ec63f81a5426efb796ef807ee207706816f31d7","source_id":"us-or","stale":false,"prev":"us-or/ors-757.660","next":"us-or/ors-757.663"},"notice":"GroundRules: Original legal text. Not legal advice."}
