{"data":{"id":"us-or/ors-758.265","jurisdiction":"us-or","citation":"ORS 758.265","heading":"Overhead facilities in assessment district after conversion.","body":"Once converted, no overhead electric or communication facilities shall be installed, maintained or operated in any underground assessment district except as authorized by ORS 758.210 to 758.270.","path":["19 - Utilities, Vehicle Code, Watercraft, Aviation","57. Utility Regulation","Chapter 758 — Utility Rights of Way and Territory Allocation; Cogeneration"],"source_url":"https://www.oregonlegislature.gov/bills_laws/ors/ors758.html","current_through":"2025 Edition","vintage":"","retrieved_at":"2026-09-03T23:50:17Z","sha256":"2da2cda6bf0d57b48753743d541ac44b2b6639409d7e35ab91db43ed30631d5c","source_id":"us-or","stale":false,"prev":"us-or/ors-758.260","next":"us-or/ors-758.270"},"notice":"GroundRules: Original legal text. Not legal advice."}
