{"data":{"id":"us-pa/66-pa.c.s.-1360","jurisdiction":"us-pa","citation":"66 Pa.C.S. § 1360","heading":"Applicability.","body":"(a) Acceptance.--The commission may accept a long-term infrastructure plan filed by a water utility prior to the effective date of this subsection in order to comply with section 1352 (relating to long-term infrastructure improvement plan).\n(b) Submission.--The commission may require the submission of a new long-term infrastructure plan by a water utility.","path":["Title 66 - PUBLIC UTILITIES","PART I PUBLIC UTILITY CODE","SUBPART C REGULATION OF PUBLIC UTILITIES GENERALLY","CHAPTER 13 RATES AND DISTRIBUTION SYSTEMS","SUBCHAPTER B DISTRIBUTION SYSTEMS"],"source_url":"https://www.palegis.us/statutes/consolidated/view-statute?txtType=HTM\u0026ttl=66\u0026div=0\u0026chpt=13\u0026sctn=60\u0026subsctn=0","current_through":"2025-01-07 (Statute Update stamp, 66 Pa.C.S.)","vintage":"","retrieved_at":"2026-09-02T16:35:03Z","sha256":"c1a9141508ba8b0132a376e85010bcbea705635599e4864ce8083e40c74b564c","source_id":"us-pa","stale":false,"prev":"us-pa/66-pa.c.s.-1359","next":"us-pa/66-pa.c.s.-1501"},"notice":"GroundRules: Original legal text. Not legal advice."}
