{"data":{"id":"us-pa/8-pa.c.s.-2462","jurisdiction":"us-pa","citation":"8 Pa.C.S. § 2462","heading":"Notice and failure to make required connection.","body":"An owner shall be given at least 45 days' notice of any ordinance requiring a water connection, and, upon failure of the owner to make the required connection, the borough may make the connection and collect the cost from the owner by a municipal claim or in an action of assumpsit. All connections required shall be uniform.","path":["Title 8 - BOROUGHS AND INCORPORATED TOWNS","PART I BOROUGHS","CHAPTER 24 WATER SYSTEM","SUBCHAPTER A.7 WATER CONNECTIONS"],"source_url":"https://www.palegis.us/statutes/consolidated/view-statute?txtType=HTM\u0026ttl=08\u0026div=0\u0026chpt=24\u0026sctn=62\u0026subsctn=0","current_through":"2026-04-02 (Statute Update stamp, 8 Pa.C.S.)","vintage":"","retrieved_at":"2026-09-02T16:30:38Z","sha256":"0af2dbc062af053e420da8cbcd59f02ce285d94f0d6ae6426ac76316925bbd45","source_id":"us-pa","stale":false,"prev":"us-pa/8-pa.c.s.-2461","next":"us-pa/8-pa.c.s.-2463"},"notice":"GroundRules: Original legal text. Not legal advice."}
