{"data":{"id":"us-ri/r.i.-gen.-laws-24-8.1-3.1","jurisdiction":"us-ri","citation":"R.I. Gen. Laws § 24-8.1-3.1","heading":"“As built” plans required.","body":"Each utility shall submit to the department of transportation a complete set of “as-built” plans, within sixty (60) days of the installation of new utility facilities, or within sixty (60) days of the relocation of existing utility facilities that affect state roads.","path":["Title 24 Highways","Chapter 8.1 Relocation of Utility Services"],"source_url":"https://webserver.rilegislature.gov/Statutes/TITLE24/24-8.1/24-8.1-3.1.htm","current_through":"site files published 2025-08-13","vintage":"","retrieved_at":"2026-09-05T19:57:15Z","sha256":"a924edbb5face92b47ba448b67d56af56ade4672a74fc4454e550f6cac004070","source_id":"us-ri","stale":true,"prev":"us-ri/r.i.-gen.-laws-24-8.1-3","next":"us-ri/r.i.-gen.-laws-24-8.1-4"},"notice":"GroundRules: Original legal text. Not legal advice."}
