{"data":{"id":"us-sc/s.c.-code-ann.-11-35-3060","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 11-35-3060","heading":"Fiscal responsibility.","body":"Every contract modification, change order, or contract price adjustment under a construction contract with the State is subject to Sections 2-47-40 and 2-47-50.","path":["Title 11 - PUBLIC FINANCE","CHAPTER 35 South Carolina Consolidated Procurement Code","ARTICLE 9 Construction, Architect-Engineer, Construction Management, and Land Surveying Services","Subarticle 3 Construction Services"],"source_url":"https://www.scstatehouse.gov/code/t11c035.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T06:32:44Z","sha256":"b972d626aa3f620e669f8bcc62e37b5cb0981a919b5896b84ea3b55d7defe016","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-11-35-3050","next":"us-sc/s.c.-code-ann.-11-35-3070"},"notice":"GroundRules: Original legal text. Not legal advice."}
