{"data":{"id":"us-sc/s.c.-code-ann.-44-55-650","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 44-55-650","heading":"Materials used in construction.","body":"All septic tanks shall be constructed of such materials as shall be required by the rules and regulations and specifications promulgated by the county board of health.","path":["Title 44 - HEALTH","CHAPTER 55 Water, Sewage, Waste Disposal","ARTICLE 7 Septic Tanks in Counties With a City of Over 70,000"],"source_url":"https://www.scstatehouse.gov/code/t44c055.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:33:44Z","sha256":"b06e52b65a2655e39ab37874df57526443a0afd6646589a731605be93058e298","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-44-55-640","next":"us-sc/s.c.-code-ann.-44-55-660"},"notice":"GroundRules: Original legal text. Not legal advice."}
