{"data":{"id":"us-sc/s.c.-code-ann.-48-39-355","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 48-39-355","heading":"Documentation of authorized activity.","body":"A permit is not required for an activity specifically authorized in this chapter. However, the department may require documentation before the activity begins from a person wishing to undertake an authorized construction or reconstruction activity. The documentation must provide that the construction or reconstruction is in compliance with the terms of the exemptions or exceptions provided in Sections 48-39-280 through 48-39-360.","path":["Title 48 - ENVIRONMENTAL PROTECTION AND CONSERVATION","CHAPTER 39 Coastal Tidelands and Wetlands"],"source_url":"https://www.scstatehouse.gov/code/t48c039.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:43:59Z","sha256":"6f61fb53d03d3b6fb362839fc99bdcb0f08508c3316fe5cced01f627795dc690","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-48-39-350","next":"us-sc/s.c.-code-ann.-48-39-360"},"notice":"GroundRules: Original legal text. Not legal advice."}
