{"data":{"id":"us-sc/s.c.-code-ann.-48-9-640","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 48-9-640","heading":"Subsequent petition if previous determination was against feasibility of district.","body":"After six months shall have expired from the date of entry of a determination by the department that the operation of a proposed district is not administratively practicable and feasible and a denial of a petition pursuant to such determination, subsequent petitions may be filed as provided in Section 48-9-510 and action taken thereon in accordance with the provisions of this chapter.","path":["Title 48 - ENVIRONMENTAL PROTECTION AND CONSERVATION","CHAPTER 9 Soil and Water Conservation Districts Law","ARTICLE 5 Creation of Soil and Water Conservation Districts"],"source_url":"https://www.scstatehouse.gov/code/t48c009.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:42:14Z","sha256":"de4a36a535ebc8ed56cbc916cc94b156ccea554ab642049834ffb9d2788b47ce","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-48-9-630","next":"us-sc/s.c.-code-ann.-48-9-650"},"notice":"GroundRules: Original legal text. Not legal advice."}
