{"data":{"id":"us-sc/s.c.-code-ann.-49-17-510","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 49-17-510","heading":"Requirement of complete survey, plans, and specifications; report.","body":"After the district is established the clerk of court shall refer the report of the engineer and viewers back to them to make a complete survey and complete plans and specifications for the drains or levees or other improvements and shall fix a time when the engineer and viewers shall complete and file such report.","path":["Title 49 - WATERS, WATER RESOURCES AND DRAINAGE","CHAPTER 17 Drainage or Levee Districts Under 1911 Act","ARTICLE 5 Proceedings Subsequent to Establishment of District"],"source_url":"https://www.scstatehouse.gov/code/t49c017.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:46:09Z","sha256":"c0348880921e9c3dbfa3f538f9c32af0091f1041c7f8712fe47c2900a2fe6cc4","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-49-17-330","next":"us-sc/s.c.-code-ann.-49-17-520"},"notice":"GroundRules: Original legal text. Not legal advice."}
