{"data":{"id":"us-sc/s.c.-code-ann.-49-4-130","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 49-4-130","heading":"Notice of construction of new surface water intake required.","body":"A surface water withdrawer must provide the department with prior written notice of the construction of a new surface water intake that changes the method of measuring the water the permittee is withdrawing, cessation of its surface water withdrawals, a proposed change in ownership, or the abandonment of a surface water intake.","path":["Title 49 - WATERS, WATER RESOURCES AND DRAINAGE","CHAPTER 4 South Carolina Surface Water Withdrawal, Permitting Use, and Reporting Act"],"source_url":"https://www.scstatehouse.gov/code/t49c004.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:45:39Z","sha256":"c9e9ff0ddc5c07815838fb0a511d39b1ae77a32d13b10e86af9fa11f3158a5ac","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-49-4-120","next":"us-sc/s.c.-code-ann.-49-4-140"},"notice":"GroundRules: Original legal text. Not legal advice."}
