{"data":{"id":"us-sc/s.c.-code-ann.-57-5-580","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 57-5-580","heading":"Cost of right-of-way as part of cost of construction.","body":"The department may charge, as part of the cost of construction, the costs of rights-of-way necessary in connection with the improvement or construction of any state highway project.","path":["Title 57 - HIGHWAYS, BRIDGES AND FERRIES","CHAPTER 5 State Highway System","ARTICLE 3 Rights-of-Way, Lands and Condemnation"],"source_url":"https://www.scstatehouse.gov/code/t57c005.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:54:34Z","sha256":"b6cb4374d31f486f56176c84ee23f49f1a692f9f5956ef4a193f288a218c8a56","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-57-5-570","next":"us-sc/s.c.-code-ann.-57-5-590"},"notice":"GroundRules: Original legal text. Not legal advice."}
