{"data":{"id":"us-sc/s.c.-code-ann.-57-5-790","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 57-5-790","heading":"Construction of project involving water-controlling device.","body":"Any such structure and all parts thereof shall be made according to plans and specifications approved by the Department.","path":["Title 57 - HIGHWAYS, BRIDGES AND FERRIES","CHAPTER 5 State Highway System","ARTICLE 5 Construction of System"],"source_url":"https://www.scstatehouse.gov/code/t57c005.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:54:34Z","sha256":"4d19f17e92af6e75637a55ccd26ecc5e72b689df2daa77ae7831a2050d3af7f4","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-57-5-780","next":"us-sc/s.c.-code-ann.-57-5-800"},"notice":"GroundRules: Original legal text. Not legal advice."}
