{"data":{"id":"us-sc/s.c.-code-ann.-58-17-3960","jurisdiction":"us-sc","citation":"S.C. Code Ann. § 58-17-3960","heading":"Suits under foregoing section shall be brought within twelve months.","body":"All suits under Section 58-17-3950 shall be brought within twelve months of the commission of the alleged wrong or injury.","path":["Title 58 - PUBLIC UTILITIES, SERVICES AND CARRIERS","CHAPTER 17 The General Railroad Law","ARTICLE 33 Penalties and Liabilities Generally"],"source_url":"https://www.scstatehouse.gov/code/t58c017.php","current_through":"2025 Session of the General Assembly","vintage":"","retrieved_at":"2026-09-02T07:56:34Z","sha256":"11f4d192361b89f20ecfc8b346df9c66a097a44f53f47ff3f5d2c11f8fef2ed4","source_id":"us-sc","stale":false,"prev":"us-sc/s.c.-code-ann.-58-17-3950","next":"us-sc/s.c.-code-ann.-58-17-3970"},"notice":"GroundRules: Original legal text. Not legal advice."}
