{"data":{"id":"us-sd/sdcl-31-12a-2","jurisdiction":"us-sd","citation":"SDCL § 31-12A-2","heading":"Application for organization of road district--Verified survey and map required.","body":"Any person making application for the organization of a road district shall first obtain an accurate survey and map of the territory intended to be embraced within the limits of the road district, showing the boundaries and area of the district. The accuracy of the survey and map shall be verified by the affidavit of the surveyor.","path":["TITLE 31. HIGHWAYS AND BRIDGES","CHAPTER 31-12A. COUNTY ROAD DISTRICTS"],"source_url":"https://sdlegislature.gov/Statutes/31-12A-2","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"8bdc50c1f22a94b64a6ca22672b36530dff4f074d353414a7ceced7e84c496d8","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-31-12a-1.2","next":"us-sd/sdcl-31-12a-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
