{"data":{"id":"us-sd/sdcl-31-2-13.1","jurisdiction":"us-sd","citation":"SDCL § 31-2-13.1","heading":"Rules--Promulgation.","body":"The Transportation Commission of the Department of Transportation may adopt rules pursuant to chapter 1-26, governing the following conditions in highway construction contracts:\n(1) Site conditions;\n(2) Suspensions of work ordered by the state (other than a suspension of work caused by the fault of the contractor or by weather);\n(3) Material changes in the scope of work specified in the contract.","path":["TITLE 31. HIGHWAYS AND BRIDGES","CHAPTER 31-2. ADMINISTRATION OF STATE HIGHWAYS"],"source_url":"https://sdlegislature.gov/Statutes/31-2-13.1","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"5f440ef53a757f870ba292f0376662d14e102f7e3adc9e7a7c15f9bb71837849","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-31-2-13","next":"us-sd/sdcl-31-2-13.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
