{"data":{"id":"us-sd/sdcl-31-26-4","jurisdiction":"us-sd","citation":"SDCL § 31-26-4","heading":"Change of line upon change of highway--Notice.","body":"When any highway along which a line has been constructed pursuant to § 31-26-1 shall be changed, the grantee shall, upon ninety days' notice in writing, remove such line to the highway as changed.","path":["TITLE 31. HIGHWAYS AND BRIDGES","CHAPTER 31-26. UTILITY LINES ALONG AND ACROSS HIGHWAYS"],"source_url":"https://sdlegislature.gov/Statutes/31-26-4","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"6bafa1dc0eb342de38240323a9daf0097885e1a1ed438b7db523983937f9e950","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-31-26-3","next":"us-sd/sdcl-31-26-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
