{"data":{"id":"us-sd/sdcl-31-27-3","jurisdiction":"us-sd","citation":"SDCL § 31-27-3","heading":"Filing required for establishment of crossing--Approval.","body":"No crossings at, above, or below grade, may be established except under plans and specifications filed with the Department of Transportation. Plans and specifications for crossings do not require the approval of the department unless a controversy exists between the applicant and the railroad.","path":["TITLE 31. HIGHWAYS AND BRIDGES","CHAPTER 31-27. RAILROAD CROSSINGS"],"source_url":"https://sdlegislature.gov/Statutes/31-27-3","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"28ec12091aee5c3c7a378f1c3ada0fb11b622cd519f11851943307fbb8bd01e2","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-31-27-2.1","next":"us-sd/sdcl-31-27-4"},"notice":"GroundRules: Original legal text. Not legal advice."}
