{"data":{"id":"us-sd/sdcl-34-38-25","jurisdiction":"us-sd","citation":"SDCL § 34-38-25","heading":"Letter of approval required before proposed construction begins--Letter and plans to be submitted to division.","body":"Before proposed construction begins the applicant shall obtain a letter of approval from the local governing body within whose jurisdiction the system is to be installed. This letter and two sets of plans, blueprints, or drawings shall be submitted to the division for examination and approval of compliance with this chapter.","path":["TITLE 34. PUBLIC HEALTH AND SAFETY","CHAPTER 34-38. FLAMMABLE AND COMBUSTIBLE LIQUIDS"],"source_url":"https://sdlegislature.gov/Statutes/34-38-25","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"206f9fbef2eb611ee42eeb8f95c816554badb08c0c9652b840c1aaf688598b14","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-34-38-24","next":"us-sd/sdcl-34-38-26"},"notice":"GroundRules: Original legal text. Not legal advice."}
