{"data":{"id":"us-sd/sdcl-34-44-18","jurisdiction":"us-sd","citation":"SDCL § 34-44-18","heading":"Approval of alternative procedure on case-by-case basis.","body":"The department may approve in writing, on a case-by-case basis, an alternative to a specific worker and public health protection requirement for an asbestos abatement project if the asbestos contractor or facility owner or operator submits a written description of the alternative procedure and demonstrates to the department's satisfaction that the proposed alternative procedure provides worker and public health protection equivalent to the protection that would be provided by the waived provisions.","path":["TITLE 34. PUBLIC HEALTH AND SAFETY","CHAPTER 34-44. ASBESTOS ABATEMENT TRAINING PROJECT"],"source_url":"https://sdlegislature.gov/Statutes/34-44-18","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"42fa38d01abbc703d968e7c4a8e6bbdbf7d3002188952dc3af657ffbef291145","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-34-44-17","next":"us-sd/sdcl-34-44-19"},"notice":"GroundRules: Original legal text. Not legal advice."}
