{"data":{"id":"us-sd/sdcl-34a-13-50","jurisdiction":"us-sd","citation":"SDCL § 34A-13-50","heading":"Scope of program.","body":"Payments made from the director for tank pulling and corrective action under the abandoned tank removal program may include:\n(1) Tank pulling, as defined in this chapter, including the disposal of tank contents and specifically excluding the replacement of surface above the backfill area; and\n(2) Removal of abandoned waste oil tanks and corrective action of a waste oil release located on an abandoned site.\nSource: SL 2000, ch 175, § 2.","path":["TITLE 34A. ENVIRONMENTAL PROTECTION","CHAPTER 34A-13. PETROLEUM INSPECTION AND RELEASE COMPENSATION"],"source_url":"https://sdlegislature.gov/Statutes/34A-13-50","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"d2931854c91e20121f31bcb452a55546f0641b8267e12612eb70266fbdef8e37","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-34a-13-49","next":"us-sd/sdcl-34a-13-51"},"notice":"GroundRules: Original legal text. Not legal advice."}
