{"data":{"id":"us-sd/sdcl-34a-2-36","jurisdiction":"us-sd","citation":"SDCL § 34A-2-36","heading":"Permit to discharge waste into surface waters required--Issuance--Maximum duration--Standards to be met--Violation.","body":"No person may discharge any waste, pollutant, or combination of pollutants, into surface waters from a point source without a permit consistent with rules promulgated by the board pursuant to chapter 1-26 and this chapter. A violation of this section is subject to § 34A-2-75.\nThe secretary may, after notice and opportunity for public hearing, issue a permit for the discharge of any waste, pollutant, or combination of pollutants into surface waters, for a period not to exceed five years, or for a period not to exceed ten years for a concentrated animal operation that is not required to have a permit under 40 C.F.R. § 122.23(d)(1), as of January 1, 2021, upon condition that such discharge meets or will meet all applicable state and federal water quality standards and effluent standards and all other requirements of this chapter. A violation of a condition of a permit issued pursuant to this section is subject to § 34A-2-75.\nSource: SDC 1939, § 61.0109 as added by SL 1947, ch 416; SL 1955, ch 430, § 1; SDC Supp 1960, § 61.0145; repealed by omission from SL 1966, ch 260, § 1; re-enacted by SL 1967, ch 340; SDCL, § 46-25-6; SL 1973, ch 280, § 9; SDCL Supp, § 46-25-52; SL 1988, ch 285, § 7; SL 1992, ch 158, § 25; SL 1993, ch 256, § 17; SL 2021, ch 161, § 1.","path":["TITLE 34A. ENVIRONMENTAL PROTECTION","CHAPTER 34A-2. WATER POLLUTION CONTROL"],"source_url":"https://sdlegislature.gov/Statutes/34A-2-36","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"8c3fb203b962be8b180a470f6134384d5f7307201823f13c8e185202cc93af4f","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-34a-2-35","next":"us-sd/sdcl-34a-2-36.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
