{"data":{"id":"us-sd/sdcl-34a-2-6","jurisdiction":"us-sd","citation":"SDCL § 34A-2-6","heading":"Planning consistent with federal requirements--Maximum daily loads.","body":"The secretary may establish and conduct a continuing planning process consistent with the requirements of the Federal Water Pollution Control Act, as amended to January 1, 2011, including the establishment and application of maximum daily loads of pollutants.\nSource: SL 1973, ch 280, § 6 (12); SDCL Supp, § 46-25-28; SL 2011, ch 165, § 35.","path":["TITLE 34A. ENVIRONMENTAL PROTECTION","CHAPTER 34A-2. WATER POLLUTION CONTROL"],"source_url":"https://sdlegislature.gov/Statutes/34A-2-6","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"7de7fb3f6935b527a9efe7ae1476ca48f53c2b0b94a101af6d52c155a72cd5a2","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-34a-2-3","next":"us-sd/sdcl-34a-2-7"},"notice":"GroundRules: Original legal text. Not legal advice."}
